dkliban@redhat.com, 05/31/2019 03:05 PM

1 1 rchan
# Sprint Plans
2
3 79 rchan
## Sprint 54
4
5
Dates: Friday May 31, 2019 - Thursday June 20, 2019  
6
Sprint Goals/Focus:
7
8
  - Pulp 2
9
      - 2.20.0 Release
10
      - high priority bugs
11 80 rchan
  - Pulp 3 Katello integration blockers
12 79 rchan
      - Bindings
13 83 dkliban@redhat.com
      - REST API bugs/features
14 79 rchan
  - Pulp 3 Core
15
      - Master/Detail Distributions
16
      - plugin updates for Distribution changes
17
      - high prio bugfixes for core as needed
18
      - FIPS dev environmenbt
19
      - Pulp 2--\>Pulp 3 Migrations
20
  - Pulp 3 Documentation work
21
      - Including quick start guides
22
      - plugin feature documentation
23
  - Pulp 3 RPM
24 81 ttereshc
      - installer improvement
25
      - modularity content (design/development)
26
      - better errata support
27 79 rchan
  - Pulp 3 Docker
28
  - Pulp 3 Python
29
      - Upload, Whitelist/Blacklist Sync
30
  - Pulp 3 Ansible Plugin  
31
    ~~\*\* move to RTD and improve the docs~~
32
      - compatibility updates w/ mazer as required (none currently planned)
33
  - Planning for what's next:
34
      - Katello integration
35
      - Pulp 3 Docker planning: docker push, schema converter and pulp2 feature gap coverage 
36
  - Packaging Pulp for Fedora 30
37
38 68 rchan
## Sprint 53
39 71 rchan
40
Dates: Friday May 10, 2019 - Thursday May 30, 2019  
41
Sprint Goals/Focus:
42
43
  - Pulp 2
44
      - 2.19.1 Release
45 77 rchan
      - high priority bugs
46 71 rchan
      - Start on 2.20.0 bugs
47
  - Katello integration blockers
48 73 bmbouter
      - Bindings
49
  - Pulp 3 Core
50
      - Master/Detail Distributions
51
      - plugin updates for Distribution changes
52
      - releasing rc2
53 78 rchan
      - high prio bugfixes for core as needed
54
      - FIPS dev environmenbt
55 71 rchan
      - Pulp 2--\>Pulp 3 Migrations
56
  - Pulp 3 Documentation work
57
      - Including quick start guides
58
      - plugin feature documentation
59
  - Pulp 3 Docker & RPM
60 1 rchan
      - Feature parity with Core RC2
61 77 rchan
  - Pulp 3 Python
62
      - Upload, Whitelist/Blacklist Sync
63 72 bmbouter
  - Pulp 3 Ansible Plugin
64
      - move to RTD and improve the docs
65 71 rchan
      - compatibility updates w/ mazer as required (none currently planned)
66
  - Planning for what's next:
67
      - Katello integration
68 1 rchan
      - Pulp 3 RPM planning: dep solving, modularity, kickstart trees
69 76 ipanova@redhat.com
      - Pulp 3 Docker planning: docker push,schema converter and pulp2 feature gap coverage 
70 71 rchan
  - Packaging Pulp for Fedora 30
71
72
## Sprint 52
73
74
Dates: Thursday April 18, 2019 - Thursday May 9, 2019  
75 69 rchan
Sprint Goals/Focus:
76 68 rchan
77
  - Pulp 2
78
      - 2.19.1 Release
79
      - high priority bugs
80
  - Katello integration blockers
81 70 rchan
      - Bindings
82 68 rchan
  - Pulp 3 Core bugs
83
  - Pulp 3 Documentation work
84
      - Including quick start guides
85
  - Pulp 3 Docker/RPM
86
      - Feature parity with Core RC
87
  - Pulp 3 Python
88
      - Whitelist/Blacklist Sync, Upload, Remote clean up, Remove Publisher (refactor)
89
  - Pulp 3 Ansible Plugin
90
      - Galaxy Collection support
91
  - Red Hat Summit demo prep
92
  - Planning for what's next:
93
      - Pulp 3 GA: FIPS & Pulp 2--\>Pulp 3 Migrations
94
      - Katello integration
95
  - Packaging Pulp for Fedora 30
96
97 64 rchan
## Sprint 51
98
99
Dates: Friday Mar 29, 2019 - Wednesday 17-Apr-2019  
100 65 rchan
Sprint Goals/Focus: Pulp 3 Plugins released working with Core RC  
101 64 rchan
Notes
102
103
  - Pulp 2
104
      - 2.19.0 Release
105
      - high priority bugs
106
  - Katello integration blockers
107
  - Pulp 3 Core bugs
108
  - Pulp 3 Documentation work
109 66 rchan
      - Including quick start guides
110
  - Pulp 3 Docker/Python/Ansible Plugin
111 1 rchan
      - Working with Pulp 3 Core RC release
112 64 rchan
      - Bug fixes discovered post beta
113
  - Red Hat Summit demo prep
114 66 rchan
  - Cert Guards (improve docs, initial release to PyPI, have tests run as part of core tests)
115 1 rchan
  - Planning for what's next:
116 66 rchan
      - Pulp 3 GA: FIPS & Pulp 2--\>Pulp 3 Migrations
117 64 rchan
      - Katello integration
118
      - Ansible Galaxy collections content type support
119 66 rchan
  - Packaging Pulp for Fedora 30
120
  - Pulp 2 clean up bugs
121 67 rchan
  - Pulp 3 Maven Plugin
122
      - Single Use case: Use Pulp 3 as a pull-through cache for Maven central
123 64 rchan
124 58 rchan
## Sprint 50
125
126
Dates: Friday Mar 8, 2019 - Thursday 28-Mar-2019  
127
Sprint Goals/Focus: Pulp 3 RC + Plugins to Core RC feature parity  
128
Notes
129
130 63 rchan
  - Katello integration blockers
131 58 rchan
  - pulplift working without issues
132
  - Pulp3 Core RC Features:
133
      - Documentation work
134 62 rchan
      - Stages API bug fixes
135 58 rchan
      - RC blockers
136
          - https://pulp.plan.io/issues?query_id=121
137
      - Fix blockers for Ansible Galaxy team
138
          - bugs
139
          - Unit testing
140 61 rchan
  - Pulp 3 Docker/RPM/Python/Ansible Plugin
141 60 rchan
      - Working with Pulp 3 Core RC release
142
      - Bug fixes discovered post beta
143 58 rchan
  - Pulp 2 bugs/features:
144
      - must fix/urgent bugs (planned feature work for 2.19.0 completed)
145 63 rchan
  - Red Hat Summit demo prep
146 58 rchan
147 50 rchan
## Sprint 49
148
149
Dates: Friday Feb 15, 2019 - Thursday 7-Mar-2019  
150
Sprint Goals/Focus: Pulp 3 RC + Plugins to Core RC feature parity  
151
Notes
152
153 56 rchan
  - pulplift working without issues
154 53 ipanova@redhat.com
  - Pulp3 Core RC Features:
155
      - ~~Lazy sync completed~~
156 1 rchan
      - UUID work
157
      - Documentation work
158 55 rchan
      - Stages API improvements
159 1 rchan
      - RC blockers
160
          - https://pulp.plan.io/issues?query_id=121
161 55 rchan
      - Fix blockers for Ansible Galaxy team
162
          - bugs
163
          - Unit testing
164 57 rchan
  - Pulp 3 Docker/RPM Plugin
165
      - Just enough work to keep these working with changes to core on master branch
166
      - note: feature parity with core RC will be done at a later time 
167 50 rchan
  - Pulp 2 bugs/features:
168
      - must fix/urgent bugs (planned feature work for 2.19.0 completed)
169
170 41 rchan
## Sprint 48
171
172
Dates: Friday Jan 25, 2019 - Thursday 14-Feb-2019  
173 48 rchan
Sprint Goals/Focus: Pulp3 RC  
174 47 rchan
Notes  
175
Sprint Goals/Focus: Pulp 2 + Pulp 3 RC + Pulp 3 Docker beta  
176 41 rchan
Notes
177 47 rchan
178
  - Pulp3 Core RC Features:
179
      - Lazy sync completed
180
      - UUID work
181
      - Documentation work
182
      - Stages API improvements
183
          - Docker sync rework
184
      - RC blockers
185
          - https://pulp.plan.io/issues?query_id=121
186
  - Pulp 2 bugs/features:
187
      - bugs as prioritized by internal stakeholders
188 41 rchan
189
## Sprint 47
190
191
Dates: Friday Jan 04, 2019 - Thursday 24-Jan-2019  
192
Sprint Goals/Focus: Pulp 2 + Pulp 3 RC + Pulp 3 Docker beta  
193
Notes
194
195
  - Pulp 2 bugs/features:
196 1 rchan
      - bugs as prioritized by internal stakeholders
197 41 rchan
      - Pulp 2.19.0:
198 49 rchan
          - Module Errata Depsolving - reconcile plan/strategy & complete merge
199 43 rchan
  - Pulp3 Core RC Features:
200 42 rchan
      - Lazy sync completed
201 43 rchan
      - UUID work
202 1 rchan
      - Content protection work
203
      - Documentation work
204 43 rchan
      - Stages API improvements
205
          - Docker sync rework
206
      - RC blockers
207 45 daviddavis
          - https://pulp.plan.io/issues?query_id=121
208 46 rchan
  - Docker beta
209
  - RPM plugin
210
      - Kickstart tree planning
211 41 rchan
212 36 rchan
## Sprint 46
213 35 rchan
214 36 rchan
Dates: Wednesday Nov 29, 2018 - Wednesday 20-Dec-2018  
215 40 rchan
Sprint Goals/Focus: Pulp 2 + Pulp 3 RC + Pulp 3 Docker beta  
216
Notes
217 1 rchan
218 40 rchan
  - Pulp 2 bugs/features:
219
      - bugs as prioritized by internal stakeholders
220
      - Pulp 2.19.0:
221
          - Module Errata Depsolving
222
  - Pulp3 Core GA Features:
223
      - Lazy sync completed (https://pulp.plan.io/issues/3693)
224
      - Docker publish
225
      - Single Content work
226
      - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770))
227
      - Content protection work
228
      - Documentation work
229
      - Katello P1 - migrations
230 38 rchan
231 36 rchan
## Sprint 45
232 1 rchan
233 35 rchan
Dates: Friday Nov 2, 2018 - Tuesday 28-Nov-2018  
234 34 rchan
Sprint Goals/Focus: Pulp 2 + Pulp 3 RC  
235
Notes
236
237 1 rchan
  - Pulp 2 bugs/features:
238 34 rchan
      - bugs as prioritized by internal stakeholders
239 37 rchan
      - 2.18.0 Module Errata Applicability
240
      - Module Errata Depsolving
241 34 rchan
  - Pulp3 Core GA Features:
242
      - Lazy sync continues (https://pulp.plan.io/issues/3693)
243
      - RPM plugin beta release
244 1 rchan
      - Docker sync + publish
245 38 rchan
      - Single Content work
246 1 rchan
      - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770))
247 38 rchan
      - Content protection work
248 39 rchan
      - Documentation work
249 35 rchan
250
## Sprint 44
251
252
Dates: Friday Oct 5, 2018 - Thursday ~~Oct 26~~ 01-Nov, 2018  
253
Sprint Goals/Focus: Pulp 2 + Pulp 3 RC  
254
Notes
255
256
  - Pulp 2 bugs/features:
257
      - bugs as prioritized by internal stakeholders
258
      - 2.19.0 Module Errata Applicability & Depsolving
259
  - Pulp3 Core GA Features:
260
      - Lazy sync continues (https://pulp.plan.io/issues/3693)
261 1 rchan
      - RPM plugin beta release
262 35 rchan
      - Docker sync + publish
263
      - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770))
264 38 rchan
      - Content protection work
265 35 rchan
      - Katello P1 items (e.g.?)  
266 34 rchan
        Decided to extend sprint through week after on-sight planning meeting to prep for next Sprint.
267 31 rchan
268
## Sprint 43
269 1 rchan
270 34 rchan
Dates: Friday Sept 14, 2018 - Thursday Oct 4, 2018  
271 1 rchan
Sprint Goals/Focus: Pulp 2 + Pulp 3 RC  
272 31 rchan
Notes
273 34 rchan
274
  - Pulp 2 bugs/features:  
275 31 rchan
    ~~\*\* 2.18.0 Module Errata support~~
276
      - bugs as prioritized by internal stakeholders
277
      - 2.19.0 Module Errata Applicability & Depsolving
278 32 daviddavis
  - Pulp3 Core GA Features:
279
      - Lazy sync continues (https://pulp.plan.io/issues/3693)
280 33 ipanova@redhat.com
      - RPM plugin beta release
281 31 rchan
      - Docker plugin (models) + sync
282 32 daviddavis
      - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770))
283
      - Content protection work (https://pulp.plan.io/issues/3968)
284
      - Katello P1 items (e.g. https://pulp.plan.io/issues/3802)
285 31 rchan
      - Installer wrap up
286 26 rchan
287
## Sprint 42
288 30 rchan
289 26 rchan
Dates: Friday Aug 24, 2018 - Thursday Sept 13, 2018  
290
Sprint Goals/Focus: Pulp 2 + Pulp 3 GA  
291
Notes
292
293 27 rchan
  - Pulp 2 bugs/features:
294
      - 2.18.0 Module Errata support
295 26 rchan
      - bugs as prioritized by internal stakeholders
296
  - Pulp3 Core GA Features:
297 30 rchan
      - Lazy sync start this sprint (https://pulp.plan.io/issues/3693)
298 27 rchan
      - ~~RPM plugin (sync +~~ publish) 
299 26 rchan
      - Docker plugin (models)
300 28 daviddavis
      - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770))
301 26 rchan
      - ~~CLI progress~~ keep #3627 on sprint, this is blocked until bindings id/href is resolved- 
302 30 rchan
      - bindings id/href resolution - off-sprint prototype from @bizhang will unblock:
303
          - ~~3851, 3856, 3580,~~ 3836
304
      - Installer work - 1 FTE during this sprint  
305 26 rchan
        ~~\* Merge & complete docs tasks that have been partially complete for some time.~~
306 20 rchan
307
## Sprint 41
308
309
Dates: Friday Aug 3, 2018 - Thursday August 23, 2018  
310
Sprint Goals/Focus: Pulp 2 + Pulp 3 GA  
311
Notes
312
313
  - Pulp 2 bugs/features:
314
      - Module Errata support
315
      - bugs as prioritized by Sat liasons
316 22 bizhang
  - Core GA Features:
317 24 rchan
      - CLI progress- keep #3627 on sprint, this is blocked until bindings id/href is resolved 
318
      - bindings id/href resolution - off-sprint prototype from @bizhang will unblock:
319 21 bmbouter
          - 3851, 3856, 3580, 3836
320
      - Installer work on sprint - 0.5 FTE starting on Aug 20th
321 20 rchan
      - Lazy sync start this sprint (https://pulp.plan.io/issues/3693)
322 21 bmbouter
      - Pulp 3 RPM (sync+publish) and Docker( models) Plugins on start again
323 20 rchan
      - Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770))
324 14 rchan
325
## Sprint 40
326
327
Dates: Friday July 13, 2018 - Thursday August 2, 2018  
328
Sprint Goals/Focus: Pulp 2 + Pulp 3 GA  
329
Notes
330
331
  - Pulp 2 bugs/features:
332
      - Pulp 2.17 features:
333 18 milan
          - Rich Dependency Support
334 14 rchan
              - Weak dependencies? (see Issue #3847)
335
          - Advanced Modularity
336
          - Container/Docker plugin enhancements (3137)
337 15 rchan
  - Core GA Features:
338 19 bmbouter
      - CLI progress - feedback from July 2 deadline digested
339 14 rchan
      - Declarative Versions - waiting on input after deep dive, then https://pulp.plan.io/issues/3844
340 17 rchan
      - Installer work on sprint - no commitment from core team on staffing
341
      - Lazy sync still on hold. Let's focus on less & know this is ready to start.
342
      - Pulp 3 RPM and Docker Plugins on hold (again, focus on less & get done before start this again)
343 14 rchan
      - Performance bugs if staffing available - some of this is already in progress
344 12 rchan
345
## Sprint 39
346
347
Dates: Friday June 22, 2018 - Thursday July 12, 2018  
348
Sprint Goals/Focus: Pulp 2 + Pulp 3 GA  
349
Notes
350
351
  - Pulp 2 bugs/features:
352
      - FIPS - can we aim to close all known stories that aren't blocked?
353
      - Pulp 2.17 features:
354
          - Advanced Modularity + Rich Dependency Support
355
          - Container/Docker plugin enhancements
356
  - Core GA Features:
357
      - Installer work on sprint - no commitment from core team on staffing
358 13 rchan
      - Trickle progress (whatever staffing allows after Pulp 2 commitments delivered) on Pulp 3 RPM and Docker Plugins
359
      - CLI progress blocked - waiting on feedback period ending July 2, little progress made until feedback is received & digested
360 12 rchan
  - Lazy sync ready to start from planning perspective, but no capacity, so this is paused as well but would welcome community contribution
361 8 rchan
362
## Sprint 38
363
364
Dates: Friday June 1, 2018 - Thursday June 21, 2018  
365
Sprint Goals/Focus: Pulp 3 GA + Pulp 2  
366
Notes
367
368 9 rchan
  - Pulp 2 bugs/features:
369
      - FIPS
370 10 rchan
      - Modularity
371 1 rchan
      - Container/Docker plugin enhancements
372 10 rchan
  - Core GA Features:
373
      - Installerwork on sprint - no commitment from core team on staffing
374 11 rchan
  - Pause progress on Pulp 3 RPM and Docker Plugins
375
      - Only one Pulp3 Docker Plugin task - and probably will not get to this in this sprint
376 8 rchan
  - Lazy sync ready to start from planning perspective, but no capacity, so this is paused as well
377 7 rchan
378
## Sprint 37
379
380
Dates: Friday May 11, 2018- Thursday May 31,2018  
381
Sprint Goals/Focus: Pulp 3 GA + Pulp 2  
382 1 rchan
Notes
383
384
  - Reserve time for fixing issues found after Core Beta released
385 10 rchan
  - Planning for conferences and Pulp 3.0 GA planning
386
387
Completion
388
389 7 rchan
  - Lazy Sync planning completed
390 5 rchan
391
## Sprint 36
392
393
Dates: Friday April 20, 2018- Thursday May 10,2018  
394
Sprint Goals/Focus: Pulp 3 Core Beta  
395
Notes
396
397 6 rchan
  - Items focused on remaining Pulp 3.0 Core Beta deliverables
398
  - Reserve time for fixing issues found after Core Beta released
399 5 rchan
  - Planning for conferences and Pulp 3.0 GA planning
400
401
## Sprint 35
402
403
Dates: Friday March 30, 2018- Thursday April 19,2018  
404
Sprint Goals/Focus: Pulp 3 Core Beta  
405
Notes
406
407
  - Items focused on Pulp 3.0 Core Beta deliverables
408 3 rchan
409
## Sprint 34
410 4 rchan
411 1 rchan
Dates: Friday March 9, 2018- Thursday March 29,2018  
412
Sprint Goals/Focus: Pulp 3 Core Beta Dev Freeze  
413
Notes
414
415
  - Moving to use Sprint Custom field instead of "Sprint/Milestone" field this sprint. 
416 4 rchan
  - Items not needing to be done by March 22 (Core Beta or otherwise) will be put on the sprint and keep "Sprint Candidate flag"
417 1 rchan
  - Originally planned to end 3/22 for a feature freeze. Feature freeze was moved to 3/29 and didn't catch this update unilt 3/28/18.