# 2.16.0 Release Status
2 1 pcreech
3 4 ttereshc
The current tentative release date for 2.16.0 is April 3, 2018
4 1 pcreech
5
## Checklist
6
7
The first item on the list **not** struck through is in progress.
8
9 4 ttereshc
  - Dev Freeze date 
10
      - March 13, 2018
11 1 pcreech
  - Beta Build date.
12 4 ttereshc
      - March 20, 2018
13 1 pcreech
  - Prerequisites to building:
14 4 ttereshc
      - Issues blocking release
15 1 pcreech
      - No procedural issues blocking this release (such as merge-forward issues, broken CI env, and similar)
16
  - master branch now tracks development for next Y release
17
  - build system adapted to build from new dev branch
18
  - test scratch build from beta branch
19
  - beta is built from release branch
20
  - waiting period (1 week after beta release date) before RC
21 4 ttereshc
      - RC Date: March 27, 2018
22 1 pcreech
  - waiting period (1 week after RC release date) before GA
23 4 ttereshc
      - GA Date: April 3, 2018
24 1 pcreech
  - verify [issues with](https://pulp.plan.io/issues?utf8=%E2%9C%93&set_filter=1&f%5B%5D=cf_4&op%5Bcf_4%5D=%3D&v%5Bcf_4%5D%5B%5D=2.16.0&f%5B%5D=cf_36&op%5Bcf_36%5D=%3D&v%5Bcf_36%5D%5B%5D=1&f%5B%5D=&c%5B%5D=project&c%5B%5D=tracker&c%5B%5D=status&c%5B%5D=priority&c%5B%5D=cf_5&c%5B%5D=subject&c%5B%5D=author&c%5B%5D=assigned_to&c%5B%5D=cf_3&c%5B%5D=cf_4&group_by=project&t%5B%5D=) "verification required" set
25
26 4 ttereshc
The rest of the checklist is conditional on whether or not blockers are found in the beta cycle; this page will be updated as the 2.16.0 release progresses. See the [[Release Schedule#Release-Stage-Conditions]] for more details.
27 1 pcreech
28 4 ttereshc
If all goes well, and no blocking bugs delay further release stages, this release should become Generally Available April 3, 2018. This page will be updated as progress is made.