Issue #4895
closed
As a user, I can see in a sync task report how much work is left to do
Status:
CLOSED - CURRENTRELEASE
Description
current file remote sync tasks do not provide a 'total' before everything is processed, it would be great if they could!
- Related to Story #4503: As a user, I can see in a sync task report how much work is left to do added
- Status changed from NEW to ASSIGNED
- Assignee set to bmbouter
- Groomed changed from No to Yes
- Sprint set to Sprint 53
Adding to sprint and grooming on the basis that it's a P1
- Status changed from ASSIGNED to POST
- Status changed from POST to MODIFIED
- Related to Test #5273: Test - As a user, I can see in a sync task report how much work is left to do added
- Sprint/Milestone set to 0.1.0
- Status changed from MODIFIED to CLOSED - CURRENTRELEASE
- Tags Katello added
- Tags deleted (
Katello-P1)
Also available in: Atom
PDF
Set total for parsing metadata
The total was not being set. This requires us to read over the file twice, but since downloading can take a long time and that is a very quick operation, it's worth knowing the total early.
https://pulp.plan.io/issues/4895 closes #4895