Project

Profile

Help

Sprint Plans » History » Revision 119

Revision 118 (rchan, 10/02/2019 11:55 PM) → Revision 119/182 (rchan, 10/14/2019 05:18 PM)

# Sprint Plans 

 ## Sprint 60 

 Dates: Friday September 27, 2019 - Thursday October 24, 10, 2019   
 Sprint Goals/Focus: 

   - Pulp 2 
       - FIPS - remote mongo access - 5512 
       - Change name of Sat/deferred-download/.treeinfo problem - 5359 
       - /etc/pulp/server.conf still has owner "root:apache" after upgrade - 5447 
   - Pulp 3 Docker 
       - docker token auth completed 
       - docker content migration  
       - Rename pulp_docker→ pulp_container 
   - Pulp 3 RPM 
       - modularity upload 
       - comps.xml types sync 5423 and publish 5495 
       - planning 
   - Pulp 3 Ansible Plugin 
       - File issues describing pulp_ansible changes discussed at AnsibleFest 
   - Pulp 3 Katello integration blockers - TBD based feedback 
       - remove duplicates 5008 https://pulp.plan.io/issues/5008  
   - Pulp 3 Core 
       - 6 issues to add to sprint as they are groomed 
       - https://pulp.plan.io/issues/3541 
   - Pulp 2--\>Pulp 3 Migrations 
       - Tool & Finish Docker migration 
       - Address any feedback from katello feedback on completed bindings 
   - Installer Work 
       - Merge/Review/Close PRs https://github.com/pulp/ansible-pulp/pulls 
       - Re-enable CI for CentOS 7, investigation is still ongoing 
   - Travis Config Generator 
       - Containers rolled out to all plugins (about 2/3 way through) 
       - Update pulp-operator to support configs needed for pulp-ansible 
       - Split container build code into its own/different repository 
   - Other container/operator work: 
       - pulp-insta-demo.sh #5375 is ready and on website; needs blog post along with operator blog post. 
       - Design work & start implementation on building/publishing pulpcore and basing images on it. Epic #5393 
       - Some design work to do 

 ## Sprint 59 

 Dates: Friday September 13, 2019 - Thursday September 26, 2019   
 Sprint Goals/Focus: 

   - Pulp 2 
       - 2.21.0 -- dev freeze complete 
       - Module Dependency solving -- merged 
       - Change name of Sat/deferred-download/.treeinfo problem - 5359 
       - Investigation of a few issues/BZs 
   - Pulp 3 Docker 
       - docker token auth 
       - Docker workflow docs 
       - schema converter 
       - docker content migration 
   - Pulp 3 RPM 
       - modularity support  
       - comps.xml types support 
       - kickstart trees  
   - Pulp 3 Ansible Plugin 
       - integration with Galaxy 
       - Prepare plugin for AnsibleFest 
   - Pulp 3 Katello integration blockers - TBD based on Katello feedback 
       - remove duplicates 5008 https://pulp.plan.io/issues/5008 
   - Pulp 3 Core 
       - Lots of planning 
       - 5304: Publish metadata in artifact storage 
   - Pulp 2--\>Pulp 3 Migrations 
       - Docker migrations 
   - Travis Config Generator 
       - Containers rolled out to all plugins (about ½ way through) 
       - Update pulp-operator to support configs needed for pulp-ansible 
       - Split container build code into its own/different repository 
   - Other container/operator work: 
       - Design work & start implementation on building/publishing pulpcore and basing images on it. Epic #5393 
           - Some design work to do 
       - Pulp-insta-demo.sh #5375 
           - Where to store it? I say pulp/pulp-operator 

 ## Sprint 58 

 Dates: Friday August 24, 2019 - Thursday September 13, 2019   
 Sprint Goals/Focus: 

 \* Pulp 2 

 ****\* 2.21.0 

 ****\* Module Dependency solving 

   - Pulp 3 Katello integration blockers 
       - Bindings - addressing bugs in openapi generator 
       - REST API features 
           - import/export 
           - remove duplicates 
   - Travis Config Generator 
       - applying to last remaining areas: cert guards, towncrier 
       - Implement container testing in the matrix 
   - Pulp 3 Core 
       - high prio bugfixes for core as needed 
       - Master detail modeling changes 
       - Pulp 2--\>Pulp 3 Migrations 
           - Simple exporter 
           - Repositories migration  
           - Any bugs coming from Katello from testing the ISO content migration part 
   - FIPS design for Pulp 2 and Pulp 3 
   - Pulp 3 RPM 
       - modularity support 
       - comps.xml types support 
       - kickstart trees 
   - Pulp 3 Docker 
       - docker recursive removal 
       - docker token auth 
       - schema converter 
       - docker content migration 
   - Pulp 3 Python 
       - no planned work 
   - Pulp 3 Ansible Plugin 
       - integration with Galaxy 
       - collection modelling improvements 
   - Container work - CI integration 
   - Installer improvements for webservers: apache & nginx 

 ## Sprint 57 

 Dates: Friday August 2, 2019 - Thursday August 23, 2019   
 Sprint Goals/Focus: 

 \* Pulp 2 

 ****\* 2.21.0 

 ****\* Module Dependency solving 

 ****\* Bug fixes 

 **** Docker performance 

 ****\* Prep for Pulp 3 migration - packaging to leave file system in right state before migration. 

   - Pulp 3 Katello integration blockers 
       - Bindings - addressing bugs in openapi generator 
       - REST API features 
           - import/export 
           - remove duplicates 
   - Travis Config Generator 
       - applying to last remaining areas: cert guards, towncrier 
       - Implement container testing in the matrix 
       - removing mariaDB support 
   - Pulp 3 Core 
       - high prio bugfixes for core as needed 
       - Master detail modeling changes 
       - Pulp 2--\>Pulp 3 Migrations 
           - Simple exporter 
           - dev environment 
   - FIPS design for Pulp 2 and Pulp 3 
   - Pulp 3 RPM 
       - modularity content (design/development) 
       - better errata support 
       - comps.xml types support 
       - kickstart trees 
   - Pulp 3 Docker 
       - docker recursive copy 
       - docker tag/untag 
       - schema converter 
   - Pulp 3 Python 
       - no planned work 
   - Pulp 3 Ansible Plugin 
       - integration with Galaxy 
       - collection modelling improvements 
       - finishing full-text search 
   - Container work - CI integration 
   - Installer improvements for webservers: apache & nginx 

 ## Sprint 56 

 Dates: Friday July 12, 2019 - Thursday August 1, 2019   
 Sprint Goals/Focus: 

 \* Pulp 2 

 ****\* 2.21.0 

 ****\* Dependency solving 

 ****\* https://pulp.plan.io/issues/5108 - multi resource locking enhancement 

 ****\* Bugs 

   - Pulp 3 Katello integration blockers 
       - Bindings - addressing bugs in openapi generator 
       - REST API features 
           - import/export 
           - remove duplicates 
   - Travis Config Generator 
       - applying to last remaining areas: cert guards, pulp_ansible, towncrier 
       - Implement container testing in the matrix 
   - Pulp 3 Core 
       - high prio bugfixes for core as needed 
       - FIPS dev environment 
       - Pulp 2--\>Pulp 3 Migrations 
           - Simple exporter 
           - dev environment 
   - Pulp 3 RPM 
       - modularity content (design/development) 
       - better errata support 
   - Pulp 3 Docker 
       - docker push investigation 
       - katello gap analyses 
   - Pulp 3 Python 
       - full pypi sync 
   - Pulp 3 Ansible Plugin 
       - integration with Galaxy 
       - collection modelling improvements 
       - finishing full-text search 
   - Container work - CI integration 
   - Installer improvements for webservers: apache & nginx 

 ## Sprint 55 

 Dates: Friday June 21, 2019 - Thursday July 11, 2019   
 Sprint Goals/Focus: 

   - Pulp 2 
       - 2.20.0 Release w/high priority bugs 
       - Dependency solving 
   - Pulp 3 Katello integration blockers 
       - Bindings 
       - REST API bugs/features 
   - Travis Config Generator 
       - applying to core repos and all plugin repos (get it in place everywhere) Currently it's applied to about half of them. 
       - Implement container testing in the matrix 
       - Implement small checks to keep our best-practices going 
           - https://pulp.plan.io/issues/4983 
           - https://pulp.plan.io/issues/4984 
           - https://pulp.plan.io/issues/4894 
   - Pulp 3 Core 
       - high prio bugfixes for core as needed 
       - FIPS dev environment 
       - Pulp 2--\>Pulp 3 Migrations 
   - Pulp 3 RPM 
       - modularity content (design/development) 
       - better errata support 
   - Pulp 3 Docker 
       - docker push investigation 
       - katello gap analyses 
   - Pulp 3 Python 
       - one-shot uploader 
   - Pulp 3 Ansible Plugin 
       - documentation improvements 
       - release process improvements 
   - Planning for what's next: 
       - Migration Plan schema needs to be defined 
   - Packaging Pulp for Fedora 30 

 ## Sprint 54 

 Dates: Friday May 31, 2019 - Thursday June 20, 2019   
 Sprint Goals/Focus: 

   - Pulp 2 
       - 2.20.0 Release 
       - high priority bugs 
   - Pulp 3 Katello integration blockers 
       - Bindings 
       - REST API bugs/features 
   - Travis Config Generator 
       - adopted by File, RPM, Docker plugins 
   - Pulp 3 Core 
       - high prio bugfixes for core as needed 
       - FIPS dev environmenbt 
       - Pulp 2--\>Pulp 3 Migrations planning 
   - Pulp 3 Documentation work 
       - Including quick start guides 
       - plugin feature documentation 
   - Pulp 3 RPM 
       - installer improvement 
       - modularity content (design/development) 
       - better errata support 
   - Pulp 3 Docker 
       - docker push investigation 
       - katello gap analyses 
   - Pulp 3 Python 
       - one-shot Upload 
   - Pulp 3 Ansible Plugin 
       - documentation improvements 
       - release process improvements 
   - Planning for what's next: 
       - Migration Plan schema needs to be defined 
   - Packaging Pulp for Fedora 30 

 ## Sprint 53 

 Dates: Friday May 10, 2019 - Thursday May 30, 2019   
 Sprint Goals/Focus: 

   - Pulp 2 
       - 2.19.1 Release 
       - high priority bugs 
       - Start on 2.20.0 bugs 
   - Katello integration blockers 
       - Bindings 
   - Pulp 3 Core 
       - Master/Detail Distributions 
       - plugin updates for Distribution changes 
       - releasing rc2 
       - high prio bugfixes for core as needed 
       - FIPS dev environmenbt 
       - Pulp 2--\>Pulp 3 Migrations 
   - Pulp 3 Documentation work 
       - Including quick start guides 
       - plugin feature documentation 
   - Pulp 3 Docker & RPM 
       - Feature parity with Core RC2 
   - Pulp 3 Python 
       - One shot Upload 
   - Pulp 3 Ansible Plugin 
       - move to RTD and improve the docs 
       - compatibility updates w/ mazer as required (none currently planned) 
   - Planning for what's next: 
       - Katello integration 
       - Pulp 3 RPM planning: dep solving, modularity, kickstart trees 
       - Pulp 3 Docker planning: docker push,schema converter and pulp2 feature gap coverage  
   - Packaging Pulp for Fedora 30 

 ## Sprint 52 

 Dates: Thursday April 18, 2019 - Thursday May 9, 2019   
 Sprint Goals/Focus: 

   - Pulp 2 
       - 2.19.1 Release 
       - high priority bugs 
   - Katello integration blockers 
       - Bindings 
   - Pulp 3 Core bugs 
   - Pulp 3 Documentation work 
       - Including quick start guides 
   - Pulp 3 Docker/RPM 
       - Feature parity with Core RC 
   - Pulp 3 Python 
       - Whitelist/Blacklist Sync, Upload, Remote clean up, Remove Publisher (refactor) 
   - Pulp 3 Ansible Plugin 
       - Galaxy Collection support 
   - Red Hat Summit demo prep 
   - Planning for what's next: 
       - Pulp 3 GA: FIPS & Pulp 2--\>Pulp 3 Migrations 
       - Katello integration 
   - Packaging Pulp for Fedora 30 

 ## Sprint 51 

 Dates: Friday Mar 29, 2019 - Wednesday 17-Apr-2019   
 Sprint Goals/Focus: Pulp 3 Plugins released working with Core RC   
 Notes 

   - Pulp 2 
       - 2.19.0 Release 
       - high priority bugs 
   - Katello integration blockers 
   - Pulp 3 Core bugs 
   - Pulp 3 Documentation work 
       - Including quick start guides 
   - Pulp 3 Docker/Python/Ansible Plugin 
       - Working with Pulp 3 Core RC release 
       - Bug fixes discovered post beta 
   - Red Hat Summit demo prep 
   - Cert Guards (improve docs, initial release to PyPI, have tests run as part of core tests) 
   - Planning for what's next: 
       - Pulp 3 GA: FIPS & Pulp 2--\>Pulp 3 Migrations 
       - Katello integration 
       - Ansible Galaxy collections content type support 
   - Packaging Pulp for Fedora 30 
   - Pulp 2 clean up bugs 
   - Pulp 3 Maven Plugin 
       - Single Use case: Use Pulp 3 as a pull-through cache for Maven central 

 ## Sprint 50 

 Dates: Friday Mar 8, 2019 - Thursday 28-Mar-2019   
 Sprint Goals/Focus: Pulp 3 RC + Plugins to Core RC feature parity   
 Notes 

   - Katello integration blockers 
   - pulplift working without issues 
   - Pulp3 Core RC Features: 
       - Documentation work 
       - Stages API bug fixes 
       - RC blockers 
           - https://pulp.plan.io/issues?query_id=121 
       - Fix blockers for Ansible Galaxy team 
           - bugs 
           - Unit testing 
   - Pulp 3 Docker/RPM/Python/Ansible Plugin 
       - Working with Pulp 3 Core RC release 
       - Bug fixes discovered post beta 
   - Pulp 2 bugs/features: 
       - must fix/urgent bugs (planned feature work for 2.19.0 completed) 
   - Red Hat Summit demo prep 

 ## Sprint 49 

 Dates: Friday Feb 15, 2019 - Thursday 7-Mar-2019   
 Sprint Goals/Focus: Pulp 3 RC + Plugins to Core RC feature parity   
 Notes 

   - pulplift working without issues 
   - Pulp3 Core RC Features: 
       - ~~Lazy sync completed~~ 
       - UUID work 
       - Documentation work 
       - Stages API improvements 
       - RC blockers 
           - https://pulp.plan.io/issues?query_id=121 
       - Fix blockers for Ansible Galaxy team 
           - bugs 
           - Unit testing 
   - Pulp 3 Docker/RPM Plugin 
       - Just enough work to keep these working with changes to core on master branch 
       - note: feature parity with core RC will be done at a later time  
   - Pulp 2 bugs/features: 
       - must fix/urgent bugs (planned feature work for 2.19.0 completed) 

 ## Sprint 48 

 Dates: Friday Jan 25, 2019 - Thursday 14-Feb-2019   
 Sprint Goals/Focus: Pulp3 RC   
 Notes   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 RC + Pulp 3 Docker beta   
 Notes 

   - Pulp3 Core RC Features: 
       - Lazy sync completed 
       - UUID work 
       - Documentation work 
       - Stages API improvements 
           - Docker sync rework 
       - RC blockers 
           - https://pulp.plan.io/issues?query_id=121 
   - Pulp 2 bugs/features: 
       - bugs as prioritized by internal stakeholders 

 ## Sprint 47 

 Dates: Friday Jan 04, 2019 - Thursday 24-Jan-2019   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 RC + Pulp 3 Docker beta   
 Notes 

   - Pulp 2 bugs/features: 
       - bugs as prioritized by internal stakeholders 
       - Pulp 2.19.0: 
           - Module Errata Depsolving - reconcile plan/strategy & complete merge 
   - Pulp3 Core RC Features: 
       - Lazy sync completed 
       - UUID work 
       - Content protection work 
       - Documentation work 
       - Stages API improvements 
           - Docker sync rework 
       - RC blockers 
           - https://pulp.plan.io/issues?query_id=121 
   - Docker beta 
   - RPM plugin 
       - Kickstart tree planning 

 ## Sprint 46 

 Dates: Wednesday Nov 29, 2018 - Wednesday 20-Dec-2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 RC + Pulp 3 Docker beta   
 Notes 

   - Pulp 2 bugs/features: 
       - bugs as prioritized by internal stakeholders 
       - Pulp 2.19.0: 
           - Module Errata Depsolving 
   - Pulp3 Core GA Features: 
       - Lazy sync completed (https://pulp.plan.io/issues/3693) 
       - Docker publish 
       - Single Content work 
       - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770)) 
       - Content protection work 
       - Documentation work 
       - Katello P1 - migrations 

 ## Sprint 45 

 Dates: Friday Nov 2, 2018 - Tuesday 28-Nov-2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 RC   
 Notes 

   - Pulp 2 bugs/features: 
       - bugs as prioritized by internal stakeholders 
       - 2.18.0 Module Errata Applicability 
       - Module Errata Depsolving 
   - Pulp3 Core GA Features: 
       - Lazy sync continues (https://pulp.plan.io/issues/3693) 
       - RPM plugin beta release 
       - Docker sync + publish 
       - Single Content work 
       - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770)) 
       - Content protection work 
       - Documentation work 

 ## Sprint 44 

 Dates: Friday Oct 5, 2018 - Thursday ~~Oct 26~~ 01-Nov, 2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 RC   
 Notes 

   - Pulp 2 bugs/features: 
       - bugs as prioritized by internal stakeholders 
       - 2.19.0 Module Errata Applicability & Depsolving 
   - Pulp3 Core GA Features: 
       - Lazy sync continues (https://pulp.plan.io/issues/3693) 
       - RPM plugin beta release 
       - Docker sync + publish 
       - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770)) 
       - Content protection work 
       - Katello P1 items (e.g.?)   
         Decided to extend sprint through week after on-sight planning meeting to prep for next Sprint. 

 ## Sprint 43 

 Dates: Friday Sept 14, 2018 - Thursday Oct 4, 2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 RC   
 Notes 

   - Pulp 2 bugs/features:   
     ~~\*\* 2.18.0 Module Errata support~~ 
       - bugs as prioritized by internal stakeholders 
       - 2.19.0 Module Errata Applicability & Depsolving 
   - Pulp3 Core GA Features: 
       - Lazy sync continues (https://pulp.plan.io/issues/3693) 
       - RPM plugin beta release 
       - Docker plugin (models) + sync 
       - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770)) 
       - Content protection work (https://pulp.plan.io/issues/3968) 
       - Katello P1 items (e.g. https://pulp.plan.io/issues/3802) 
       - Installer wrap up 

 ## Sprint 42 

 Dates: Friday Aug 24, 2018 - Thursday Sept 13, 2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 GA   
 Notes 

   - Pulp 2 bugs/features: 
       - 2.18.0 Module Errata support 
       - bugs as prioritized by internal stakeholders 
   - Pulp3 Core GA Features: 
       - Lazy sync start this sprint (https://pulp.plan.io/issues/3693) 
       - ~~RPM plugin (sync +~~ publish)  
       - Docker plugin (models) 
       - Continue Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770)) 
       - ~~CLI progress~~ keep #3627 on sprint, this is blocked until bindings id/href is resolved-  
       - bindings id/href resolution - off-sprint prototype from @bizhang will unblock: 
           - ~~3851, 3856, 3580,~~ 3836 
       - Installer work - 1 FTE during this sprint   
         ~~\* Merge & complete docs tasks that have been partially complete for some time.~~ 

 ## Sprint 41 

 Dates: Friday Aug 3, 2018 - Thursday August 23, 2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 GA   
 Notes 

   - Pulp 2 bugs/features: 
       - Module Errata support 
       - bugs as prioritized by Sat liasons 
   - Core GA Features: 
       - CLI progress- keep #3627 on sprint, this is blocked until bindings id/href is resolved  
       - bindings id/href resolution - off-sprint prototype from @bizhang will unblock: 
           - 3851, 3856, 3580, 3836 
       - Installer work on sprint - 0.5 FTE starting on Aug 20th 
       - Lazy sync start this sprint (https://pulp.plan.io/issues/3693) 
       - Pulp 3 RPM (sync+publish) and Docker( models) Plugins on start again 
       - Performance bugs (1 [performance issue](https://pulp.plan.io/issues/3812) and 1 [benchmark comparison issue](https://pulp.plan.io/issues/3770)) 

 ## Sprint 40 

 Dates: Friday July 13, 2018 - Thursday August 2, 2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 GA   
 Notes 

   - Pulp 2 bugs/features: 
       - Pulp 2.17 features: 
           - Rich Dependency Support 
               - Weak dependencies? (see Issue #3847) 
           - Advanced Modularity 
           - Container/Docker plugin enhancements (3137) 
   - Core GA Features: 
       - CLI progress - feedback from July 2 deadline digested 
       - Declarative Versions - waiting on input after deep dive, then https://pulp.plan.io/issues/3844 
       - Installer work on sprint - no commitment from core team on staffing 
       - Lazy sync still on hold. Let's focus on less & know this is ready to start. 
       - Pulp 3 RPM and Docker Plugins on hold (again, focus on less & get done before start this again) 
       - Performance bugs if staffing available - some of this is already in progress 

 ## Sprint 39 

 Dates: Friday June 22, 2018 - Thursday July 12, 2018   
 Sprint Goals/Focus: Pulp 2 + Pulp 3 GA   
 Notes 

   - Pulp 2 bugs/features: 
       - FIPS - can we aim to close all known stories that aren't blocked? 
       - Pulp 2.17 features: 
           - Advanced Modularity + Rich Dependency Support 
           - Container/Docker plugin enhancements 
   - Core GA Features: 
       - Installer work on sprint - no commitment from core team on staffing 
       - Trickle progress (whatever staffing allows after Pulp 2 commitments delivered) on Pulp 3 RPM and Docker Plugins 
       - CLI progress blocked - waiting on feedback period ending July 2, little progress made until feedback is received & digested 
   - Lazy sync ready to start from planning perspective, but no capacity, so this is paused as well but would welcome community contribution 

 ## Sprint 38 

 Dates: Friday June 1, 2018 - Thursday June 21, 2018   
 Sprint Goals/Focus: Pulp 3 GA + Pulp 2   
 Notes 

   - Pulp 2 bugs/features: 
       - FIPS 
       - Modularity 
       - Container/Docker plugin enhancements 
   - Core GA Features: 
       - Installerwork on sprint - no commitment from core team on staffing 
   - Pause progress on Pulp 3 RPM and Docker Plugins 
       - Only one Pulp3 Docker Plugin task - and probably will not get to this in this sprint 
   - Lazy sync ready to start from planning perspective, but no capacity, so this is paused as well 

 ## Sprint 37 

 Dates: Friday May 11, 2018- Thursday May 31,2018   
 Sprint Goals/Focus: Pulp 3 GA + Pulp 2   
 Notes 

   - Reserve time for fixing issues found after Core Beta released 
   - Planning for conferences and Pulp 3.0 GA planning 

 Completion 

   - Lazy Sync planning completed 

 ## Sprint 36 

 Dates: Friday April 20, 2018- Thursday May 10,2018   
 Sprint Goals/Focus: Pulp 3 Core Beta   
 Notes 

   - Items focused on remaining Pulp 3.0 Core Beta deliverables 
   - Reserve time for fixing issues found after Core Beta released 
   - Planning for conferences and Pulp 3.0 GA planning 

 ## Sprint 35 

 Dates: Friday March 30, 2018- Thursday April 19,2018   
 Sprint Goals/Focus: Pulp 3 Core Beta   
 Notes 

   - Items focused on Pulp 3.0 Core Beta deliverables 

 ## Sprint 34 

 Dates: Friday March 9, 2018- Thursday March 29,2018   
 Sprint Goals/Focus: Pulp 3 Core Beta Dev Freeze   
 Notes 

   - Moving to use Sprint Custom field instead of "Sprint/Milestone" field this sprint.  
   - Items not needing to be done by March 22 (Core Beta or otherwise) will be put on the sprint and keep "Sprint Candidate flag" 
   - Originally planned to end 3/22 for a feature freeze. Feature freeze was moved to 3/29 and didn't catch this update unilt 3/28/18.