pthomas@redhat.com, 12/13/2016 02:42 AM

1 1 pthomas@redhat.com
# Pulp 2.11 Test Result Summary
2
3
Summary
4
5
Status: \[ \] Not Started \[ \] In Progress \[ \] Paused \[ \] Blocked \[X \] Finished  
6
Release Lead:  
7
Started On:  
8
Finished On:  
9
Beta/RC URL: https://repos.fedorapeople.org/pulp/pulp/beta/2.11/  
10
Redmine URL: http://https://pulp.plan.io/issues?query_id=61
11
12
The number of new features/stories were limited. Upgrade testing needed to be done manually and automation needed to be updated due to some issues found. moother due to the addition of automated test jobs in Jenkins. Automated tests have increased from 432 in 2.10 to 472 in 2.11 . The jobs were run nightly on EL6, EL7 , Fedora 23 and Fedora 24. Jenkins Jobs were set to run on master before beta builds. That helped in identifying issues early. As a result, the beta produced were stable. Manual testing was limited to the scenarios that do not yet have pulp smash tests. All the new features have been added to pulp-smash backlog to automate or already automated.
13
14
Pulp QE team approves the release of the 2.10 build for general consumption of our customers.
15
16
Beta History  
17
Beta 1: August 4, 2016  
18
Beta 2: August 19, 2016  
19
Beta 3: August 29, 2016  
20
RC 1: September 6, 2016  
21
RC 2: September 13, 2016
22
23
Automation  
24
New tests were added for the following new features
25
26
pulp_smash.tests.rpm.api_v2.test_rsync_distributor 9  
27
pulp_smash.tests.rpm.api_v2.test_signatures_checked_for_copies 12  
28
pulp_smash.tests.rpm.api_v2.test_signatures_checked_for_uploads 10  
29
pulp_smash.tests.rpm.api_v2.test_signatures_saved_for_packages 10  
30
pulp_smash.tests.rpm.api_v2.test_force_full 3
31
32
Status: \[X\] PASSED \[ \] FAILED  
33
System: x86_64  
34
RHEL 6.8 RHEL 7.3  
35
Installation PASS PASS  
36
Smoke PASS PASS  
37
API PASS PASS  
38
CLI PASS PASS  
39
Upgrade PASS PASS
40
41
NOTES:
42
43
2.11 Features and Bugs  
44
https://pulp.plan.io/issues?query_id=61
45
46
Bugs Verified
47
48
Action Items  
49
The following process improvements will be made as a result of this release  
50
Automation: Continue to Improve automation coverage. And add more matrix to automated upgrade testing.  
51
Manual Testing: Organize manual testing efforts better. Identify areas for upgrade testing and feature testing for manual testing that are not covered in the automation.