# 2.16.0 Release Status
2 1 pcreech
3 2 pcreech
The current tentative release date for 2.16.0 is tbd
4 1 pcreech
5
## Checklist
6
7
The first item on the list **not** struck through is in progress.
8
9
  - Beta Build date.
10
      - (tbd)
11
  - Prerequisites to building:
12
      - Issues blocking release:
13
      - No procedural issues blocking this release (such as merge-forward issues, broken CI env, and similar)
14
  - master branch now tracks development for next Y release
15
  - build system adapted to build from new dev branch
16
  - test scratch build from beta branch
17
  - beta is built from release branch
18
  - waiting period (1 week after beta release date) before RC
19
      - RC Date: (tbd)
20
  - waiting period (1 week after RC release date) before GA
21
      - GA Date: (tbd)
22
  - verify [issues with](https://pulp.plan.io/issues?utf8=%E2%9C%93&set_filter=1&f%5B%5D=cf_4&op%5Bcf_4%5D=%3D&v%5Bcf_4%5D%5B%5D=2.16.0&f%5B%5D=cf_36&op%5Bcf_36%5D=%3D&v%5Bcf_36%5D%5B%5D=1&f%5B%5D=&c%5B%5D=project&c%5B%5D=tracker&c%5B%5D=status&c%5B%5D=priority&c%5B%5D=cf_5&c%5B%5D=subject&c%5B%5D=author&c%5B%5D=assigned_to&c%5B%5D=cf_3&c%5B%5D=cf_4&group_by=project&t%5B%5D=) "verification required" set
23
24
The rest of the checklist is conditional on whether or not blockers are found in the beta cycle; this page will be updated as the 2.15.0 release progresses. See the [[Release Schedule#Release-Stage-Conditions]] for more details.
25
26
If all goes well, and no blocking bugs delay further release stages, this release should become Generally Available December 11, 2017. This page will be updated as progress is made.