Project

Profile

Help

« Previous | Next » 

Revision d269107e

Added by mhrivnak over 5 years ago

Can sync v1 and v2 APIs together, and optionally disable v1 sync

fixes #1449 https://pulp.plan.io/issues/1449

I combined the root v1 and v2 sync steps into one. The step system requires a single root step, and only one layer of children can report status and progress. This required the refactor, combining each collection of steps onto one parent.